Well La-107 has been completed and classified as production well Testing of the well has been completed with a maximum flowrate of 54 mmscf/d maximum flowrate through
Read full articleVictoria Oil & Gas Plc is pleased to provide an update on the Group & drilling operations, which are managed by Gaz du Cameroon (“GDC”), a wholly owned
Read full article